Need Help? Contact Us service@plas.com
Get App

PPO NORYL™  EM6101-8846 SABIC INNOVATIVE US

32
  • Unit Price:
    $3796 USD/MT
  • Packaging Specification:
    25KG/PKG
  • Supply Quantity:
    10MT
  • Delivery Terms:
    FOB
  • Port of Loading:
    China Main Port
  • Accepted Payment Methods:
    T/T
  • Shipping:
    Negotiate supplier for shipping details

Supplier Information

ASIA PLASTIC EXCHANGE LIMITED

serv********

For more detailed information including pricing, customization, and shipping, please contact supplier.

Technical Data Sheet

Physical PropertiesTest ConditionTest MethodTest ResultUnit
Moisture Absorption24 hrASTM D5700.20%
Modeling Shrinkage - Flow3.20 mm内部方法0.50 到 0.70%
Mechanical PropertiesTest ConditionTest MethodTest ResultUnit
Tensile ElongationBreakASTM D63850%
Flexural Modulus100 mm SpanASTM D7902300Mpa
Flexural StrengthYield, 100 mm SpanASTM D79081.0Mpa
Tensile StrengthYieldASTM D63853.0Mpa
Thermal PropertiesTest ConditionTest MethodTest ResultUnit
Deflection Temperature Under Load?0.45 MPa, Unannealed, 6.40 mmASTM D648123°C
Deflection Temperature Under Load?1.8 MPa, Unannealed, 6.40 mmASTM D648121°C
Coefficient of Linear Thermal Expansion (Flow)0 to 100°CASTM E8319.4E-5cm/cm/°C
InjectionTest ConditionTest MethodTest ResultUnit
Drying Time3.0 到 4.0hr
Suggested Shot Size30 到 70%
Rear Temperature230 到 280°C
Middle Temperature245 到 290°C
Front Temperature255 到 295°C
Nozzle Temperature265 到 295°C
Back Pressure0.300 到 0.700Mpa
Screw Speed20 到 100rpm
Vent Depth0.038 到 0.051mm
Drying Temperature95 到 105°C
Suggested Max Moisture0.020%
Processing (Melt) Temp265 到 295°C
Mold Temperature65 到 95°C
Impact PropertiesTest ConditionTest MethodTest ResultUnit
Instrumented Dart Impact-30°C, Energy at PeakASTM D376325.0J
Instrumented Dart Impact23°C, Energy at PeakASTM D376353.0J
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.