Need Help? Contact Us service@plas.com
Get App

PA/TPE Pebax®Rnew® 30R51 SA 01 ARKEMA USA

20
  • Unit Price:
    $19799 USD/MT
  • Packaging Specification:
    25 KG/PKG
  • Supply Quantity:
    10MT
  • Delivery Terms:
    FOB
  • Port of Loading:
    China Main Port
  • Accepted Payment Methods:
    T/T
  • Shipping:
    Negotiate supplier for shipping details

Supplier Information

ASIA PLASTIC EXCHANGE LIMITED

+86 755 2787 3515View
serv********View

For more detailed information including pricing, customization, and shipping, please contact supplier.

Material Description
Technical Data Sheet

Material Description

  • Material Properties:--
  • Application Areas:--
  • Color:--
  • Grade:Injection grade

Technical Data Sheet Compare

physical property Test ConditionTest MethodTest ResultUnit
Water absorption rateSaturation, 23°CISO 6220%
Water absorption rateEquilibrium, 23°C, 50% RHISO 622.5%
Mechanical performanceTest ConditionTest MethodTest ResultUnit
Tensile modulusISO 527-2--Mpa
Tensile stressBreakISO 527-216.0Mpa
Tensile stress50% StrainISO 527-2--Mpa
Tensile strainBreakISO 527-2> 300%
Thermal performanceTest ConditionTest MethodTest ResultUnit
Melting temperature 2ISO 11357-3150°C
Electrical performanceTest ConditionTest MethodTest ResultUnit
Surface resistivityIEC 60093--ohms
Volume resistivityIEC 600931.0E+10ohms·cm
Volume resistivityRenewable Carbon ConentCSA LISTED41%
injectionTest ConditionTest MethodTest ResultUnit
drying temperature65 到 75°C
drying time4.0 到 6.0hr
Processing (melt) temperature200 到 270°C
Mold temperature25 到 60°C
squeezeTest ConditionTest MethodTest ResultUnit
drying temperature65 到 75°C
drying time4.0 到 6.0hr
Melt Temperature 210 到 230°C
hardnessTest ConditionTest MethodTest ResultUnit
Supporting hardnessShore D, 15 secISO 7619-130
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.