Need Help? Contact Us service@plas.com
Get App

PES SUMIKAEXCEL®  FS2200 SUMITOMO JAPAN

141
  • Unit Price:
    $37430 USD/MT
  • Packaging Specification:
    25 KG/PKG
  • Supply Quantity:
    10MT
  • Delivery Terms:
    FOB
  • Port of Loading:
    China Main Port
  • Accepted Payment Methods:
    T/T
  • Shipping:
    Negotiate supplier for shipping details

Supplier Information

ASIA PLASTIC EXCHANGE LIMITED

+86 755 2787 3515View
serv********View

For more detailed information including pricing, customization, and shipping, please contact supplier.

Material Description
Technical Data Sheet

Material Description

  • Material Properties:--
  • Application Areas:--
  • Color:--
  • Grade:Injection grade

Technical Data Sheet Compare

physical property Test ConditionTest MethodTest ResultUnit
Shrinkage rateMDASTMD9550.60%
Shrinkage rateTDASTMD9550.60%
Water absorption rate24hrASTMD5700.39%
Mechanical performanceTest ConditionTest MethodTest ResultUnit
elongationBreakASTMD63815%
Bending modulusASTMD7902450Mpa
bending strength ASTMD790118Mpa
Tensile strengthASTMD63877.0Mpa
Thermal performanceTest ConditionTest MethodTest ResultUnit
Hot deformation temperature1.8MPa,UnannealedASTMD648203°C
Linear coefficient of thermal expansionMD:-50to150°CASTMD6965.9E-05cm/cm/°C
Linear coefficient of thermal expansionTD:50to150°CASTMD6966.2E-05cm/cm/°C
Electrical performanceTest ConditionTest MethodTest ResultUnit
Arc resistanceASTMD49580.0sec
Volume resistivityASTMD2571E+16ohms·cm
Impact performanceTest ConditionTest MethodTest ResultUnit
Cantilever beam without notch impact strength6.40mmASTMD256980J/m
hardnessTest ConditionTest MethodTest ResultUnit
Rockwell hardnessR-ScaleASTMD785118
flammabilityTest ConditionTest MethodTest ResultUnit
UL flame retardant rating0.43mmUL94V-0
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.