Need Help? Contact Us service@plas.com
Get App

PC Arnite®  J-50-20YG-BK223 DSM HOLAND

123
  • Unit Price:
    $2840 USD/MT
  • Packaging Specification:
    25 KG/PKG
  • Supply Quantity:
    10MT
  • Delivery Terms:
    FOB
  • Port of Loading:
    China Main Port
  • Accepted Payment Methods:
    T/T
  • Shipping:
    Negotiate supplier for shipping details

Supplier Information

ASIA PLASTIC EXCHANGE LIMITED

+86 755 2787 3515View
serv********View

For more detailed information including pricing, customization, and shipping, please contact supplier.

Material Description
Technical Data Sheet

Material Description

  • Material Properties:Filler: Glass fiber reinf 20% filler by weight
  • Application Areas:--
  • Color:--
  • Grade:Enhanced level

Technical Data Sheet Compare

physical property Test ConditionTest MethodTest ResultUnit
Shrinkage rateMD:3.18mmASTMD9550.30%
Water absorption rate24hrASTMD5700.10%
Mechanical performanceTest ConditionTest MethodTest ResultUnit
Tensile modulus23°CASTMD6386210Mpa
Tensile strengthBreak,23°CASTMD638110Mpa
elongationBreak,23°CASTMD6383.0%
Bending modulus23°CASTMD7905520Mpa
bending strength Break,23°CASTMD790152Mpa
Thermal performanceTest ConditionTest MethodTest ResultUnit
Hot deformation temperature0.45MPa,UnannealedASTMD648152°C
Hot deformation temperature1.8MPa,UnannealedASTMD648143°C
RTIElec1.5mmUL74675.0°C
RTIElec3.0mmUL74675.0°C
Evolution Calendar intelligent importer1.5mmUL74675.0°C
Evolution Calendar intelligent importer3.0mmUL74675.0°C
RTIStr1.5mmUL74675.0°C
RTIStr3.0mmUL74675.0°C
hardnessTest ConditionTest MethodTest ResultUnit
Rockwell hardnessM-ScaleASTMD78580
flammabilityTest ConditionTest MethodTest ResultUnit
UL flame retardant rating1.5mmUL94V-2
UL flame retardant rating3.0mmUL94V-0
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.