
PA6 Sumikon® FM-PF-745 SUMITOMO BAKELITE
124
- Unit Price:
- $3397 USD/MT
- Packaging Specification:
- 25 KG/PKG
- Supply Quantity:
- 40MT
- Delivery Terms:
- FOB
- Port of Loading:
- China Main Port
- Accepted Payment Methods:
- T/T
- Shipping:
- Negotiate supplier for shipping details
Supplier Information
ASIA PLASTIC EXCHANGE LIMITED
+86 755 2787 3515View
serv********View
For more detailed information including pricing, customization, and shipping, please contact supplier.
Material Description
Technical Data Sheet
Material Description
- Material Properties:--
- Application Areas:Metal replacement
- Color:--
- Grade:Injection grade
Technical Data Sheet
physical property | Test Condition | Test Method | Test Result | Unit |
---|---|---|---|---|
Water absorption rate | 23℃,24hr | ASTM D570 | 0.020 | % |
Flow shrinkage rate | ASTM D955 | 0.40 | % | |
Rockwell hardness | R -Sale | ASTM D785 | 118 | |
Lateral shrinkage rate | ISO 294-4 | 0.50 | % |
Mechanical performance | Test Condition | Test Method | Test Result | Unit |
---|---|---|---|---|
Yield bending strength | ASTM D790 | 92.0 | Mpa | |
Yield tensile strength | ASTM D638 | 51.0 | Mpa | |
Impact strength of cantilever beam gap | ASTM D256 | 52 | J/m | |
elongation at yield | ASTM D638 | 0.30 | % | |
Bending modulus | ASTM D790 | 16000 | Mpa |
Thermal performance | Test Condition | Test Method | Test Result | Unit |
---|---|---|---|---|
Hot deformation temperature | 1.8MPa,Unannealed | ASTM D648 | 165 | °C |
UL flame retardant rating | UL 94 | HB |
Electrical performance | Test Condition | Test Method | Test Result | Unit |
---|---|---|---|---|
Volume resistivity | ASTM D257 | 10 | ohm·cm |
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.